16/07/2013
MJ2 delivered two VLH DN 5000 in North Eastern Italy for the Isola Dovarese HPP on the Oglio River. The site configuration has a bypass with a double channel (continua)
16/07/2013
By the end of March 2013, a 345 kW VLH DN 5000 has been delivered to the La Glacière site in Millau. It has been commissioned (continua)